Controlled execution
Quality documented. Risk managed.
Factory and site controls support consistent fabrication, installation, weather sealing and safe project delivery.
Quality systems
Control from factory to site.
Project quality plans, method statements, inspection and test plans, material traceability and stage-wise checks support consistent results.
- Design and interface coordination
- Incoming material inspection
- Fabrication dimensional checks
- Installation and water-sealing review
- As-built documentation and handover
Safety first
Planned work. Trained teams.
Site-specific hazard assessment, PPE, work-at-height controls, lifting plans, toolbox talks and incident reporting are integrated into execution planning.

Certified quality management
ISO 9001:2015
Glass Kraft has been assessed by QCAS for its Quality Management System covering facade works and related manufacturing and installation activities.
- Certificate number
- QCAS-GSKT-23-16301
- Certification date
- 16 December 2023
- Re-certification due
- 15 December 2026
Certified scope: Facade works; aluminium and uPVC sliding-window manufacturing and installation; structural and spider glazing; MS structures; and aluminium, stainless-steel and MS railings.
Validity is subject to successful annual surveillance audits, as stated on the issued certificate.
